1. Preliminaries & General Requirements
4- 1.1
Mobilisation and demobilisation
Item - 1.2
Site establishment and temporary facilities
Item - 1.4
Temporary electricity and water
Item - 1.5
Scaffolding and access equipment
Item
2. Survey, Setting Out & Existing Conditions
2- 2.5
Testing of existing services
Item - 2.6
Protection of existing finishes/services
Item
3. Demolition & Removal Works
4- 3.1
Demolition of existing walls
Item - 3.2
Removal of partitions
Item - 3.15
Core cutting and openings
Item - 3.17
Making good after demolition
Item
4. Civil & Blockwork
10- 4.1
New block walls
Item - 4.2
Partition walls
Item - 4.3
Cement blockwork
Item - 4.4
Lightweight/block partitions
Item - 4.5
Door openings
Item - 4.6
Lintels
Item - 4.7
Concrete works
Item - 4.8
Structural alterations
Item - 4.10
Plastering
Item - 4.14
Waterproofing preparation
Item
5. Floor Preparation
2- 5.4
New cement screed
Item - 5.10
Floor chipping for MEP conduits
Item
6. Waterproofing
4- 6.1
Bathroom waterproofing
Item - 6.4
Balcony waterproofing
Item - 6.5
Roof waterproofing
Item - 6.6
Terrace waterproofing
Item
7. Wall & Ceiling Finishes
10- 7.1
Internal plastering
Item - 7.2
Skim coat
Item - 7.4
Gypsum plasterboard
Item - 7.8
Thermal insulation
Item - 7.12
Stucco finish
Item - 7.13
Paint preparation
Item - 7.14
Primer
Item - 7.15
Internal wall paint
Item - 7.16
Ceiling paint
Item - 7.18
External paint where applicable
Item
8. Floor Finishes
5- 8.1
Porcelain tiles
Item - 8.3
Marble
Item - 8.4
Granite
Item - 8.14
Skirting
Item - 8.18
Grouting
Item
9. Wall Tiling
3- 9.1
Bathroom wall tiles
Item - 9.2
Kitchen wall tiles
Item - 9.6
Tile grout
Item
10. Ceilings
4- 10.1
Gypsum board ceilings
Item - 10.11
Ceiling access panels
Item - 10.12
Shadow gaps
Item - 10.13
Inspection hatches
Item
11. Doors & Ironmongery
2- 11.1
Main entrance doors
Item - 11.2
Internal timber doors
Item
12. Windows & Glazing
1- 12.2
uPVC windows
Item
14. Kitchen
1- 14.7
Drainage connections
Item
15. Bathrooms & Sanitary
8- 15.1
WC
Item - 15.2
Wash basin
Item - 15.3
Vanity
Item - 15.4
Bidet
Item - 15.5
Shower mixer
Item - 15.6
Shower set
Item - 15.9
Bathroom mirrors
Item - 15.11
Floor drains
Item
16. Plumbing & Drainage
10- 16.1
Cold-water pipework
Item - 16.2
Hot-water pipework
Item - 16.3
Drainage pipework
Item - 16.4
Soil and waste pipes
Item - 16.5
Vent pipes
Item - 16.6
Water tanks
Item - 16.7
Pumps
Item - 16.8
Water heaters
Item - 16.15
Pressure testing
Item - 16.16
Drainage testing
Item
18. Electrical Power
11- 18.1
Main DB
Item - 18.2
Sub-DBs
Item - 18.3
Distribution boards
Item - 18.4
MCCB/MCB/RCD
Item - 18.8
Conduits
Item - 18.9
Electrical cables
Item - 18.10
Junction boxes
Item - 18.11
Isolators
Item - 18.12
Switches
Item - 18.13
Socket outlets
Item - 18.23
Testing and commissioning
Item
19. Lighting
4- 19.1
Downlights
Item - 19.10
Cove lighting
Item - 19.11
Outdoor lighting
Item - 19.18
Timers
Item
20. ELV / Low Voltage Systems
6- 20.1
Data cabling
Item - 20.2
Telephone points
Item - 20.3
Wi-Fi access points
Item - 20.4
TV points
Item - 20.6
CCTV
Item - 20.19
Smart-home controls
Item
22. External Works
3- 22.4
Driveway works
Item - 22.17
Drainage
Item - 22.19
Garden electrical points
Item
23. Pool Works — If Applicable
7- 23.1
Pool civil works
Item - 23.2
Pool waterproofing
Item - 23.3
Pool tiles
Item - 23.5
Pool drainage
Item - 23.6
Pool filtration
Item - 23.11
Pool deck
Item - 23.12
Outdoor shower
Item
25. External / Villa Services
1- 25.7
EV charger provision
Item
26. Testing, Commissioning & Handover
1- 26.21
Authority approvals
Item