Master Data

BOQ Items

The master list of items used across the project (103 items). Add or remove items here — they feed the dashboard and reports.

1. Preliminaries & General Requirements

4
  • 1.1

    Mobilisation and demobilisation

  • 1.2

    Site establishment and temporary facilities

  • 1.4

    Temporary electricity and water

  • 1.5

    Scaffolding and access equipment

2. Survey, Setting Out & Existing Conditions

2
  • 2.5

    Testing of existing services

  • 2.6

    Protection of existing finishes/services

3. Demolition & Removal Works

4
  • 3.1

    Demolition of existing walls

  • 3.2

    Removal of partitions

  • 3.15

    Core cutting and openings

  • 3.17

    Making good after demolition

4. Civil & Blockwork

10
  • 4.1

    New block walls

  • 4.2

    Partition walls

  • 4.3

    Cement blockwork

  • 4.4

    Lightweight/block partitions

  • 4.5

    Door openings

  • 4.6

    Lintels

  • 4.7

    Concrete works

  • 4.8

    Structural alterations

  • 4.10

    Plastering

  • 4.14

    Waterproofing preparation

5. Floor Preparation

2
  • 5.4

    New cement screed

  • 5.10

    Floor chipping for MEP conduits

6. Waterproofing

4
  • 6.1

    Bathroom waterproofing

  • 6.4

    Balcony waterproofing

  • 6.5

    Roof waterproofing

  • 6.6

    Terrace waterproofing

7. Wall & Ceiling Finishes

10
  • 7.1

    Internal plastering

  • 7.2

    Skim coat

  • 7.4

    Gypsum plasterboard

  • 7.8

    Thermal insulation

  • 7.12

    Stucco finish

  • 7.13

    Paint preparation

  • 7.14

    Primer

  • 7.15

    Internal wall paint

  • 7.16

    Ceiling paint

  • 7.18

    External paint where applicable

8. Floor Finishes

5
  • 8.1

    Porcelain tiles

  • 8.3

    Marble

  • 8.4

    Granite

  • 8.14

    Skirting

  • 8.18

    Grouting

9. Wall Tiling

3
  • 9.1

    Bathroom wall tiles

  • 9.2

    Kitchen wall tiles

  • 9.6

    Tile grout

10. Ceilings

4
  • 10.1

    Gypsum board ceilings

  • 10.11

    Ceiling access panels

  • 10.12

    Shadow gaps

  • 10.13

    Inspection hatches

11. Doors & Ironmongery

2
  • 11.1

    Main entrance doors

  • 11.2

    Internal timber doors

12. Windows & Glazing

1
  • 12.2

    uPVC windows

14. Kitchen

1
  • 14.7

    Drainage connections

15. Bathrooms & Sanitary

8
  • 15.1

    WC

  • 15.2

    Wash basin

  • 15.3

    Vanity

  • 15.4

    Bidet

  • 15.5

    Shower mixer

  • 15.6

    Shower set

  • 15.9

    Bathroom mirrors

  • 15.11

    Floor drains

16. Plumbing & Drainage

10
  • 16.1

    Cold-water pipework

  • 16.2

    Hot-water pipework

  • 16.3

    Drainage pipework

  • 16.4

    Soil and waste pipes

  • 16.5

    Vent pipes

  • 16.6

    Water tanks

  • 16.7

    Pumps

  • 16.8

    Water heaters

  • 16.15

    Pressure testing

  • 16.16

    Drainage testing

18. Electrical Power

11
  • 18.1

    Main DB

  • 18.2

    Sub-DBs

  • 18.3

    Distribution boards

  • 18.4

    MCCB/MCB/RCD

  • 18.8

    Conduits

  • 18.9

    Electrical cables

  • 18.10

    Junction boxes

  • 18.11

    Isolators

  • 18.12

    Switches

  • 18.13

    Socket outlets

  • 18.23

    Testing and commissioning

19. Lighting

4
  • 19.1

    Downlights

  • 19.10

    Cove lighting

  • 19.11

    Outdoor lighting

  • 19.18

    Timers

20. ELV / Low Voltage Systems

6
  • 20.1

    Data cabling

  • 20.2

    Telephone points

  • 20.3

    Wi-Fi access points

  • 20.4

    TV points

  • 20.6

    CCTV

  • 20.19

    Smart-home controls

22. External Works

3
  • 22.4

    Driveway works

  • 22.17

    Drainage

  • 22.19

    Garden electrical points

23. Pool Works — If Applicable

7
  • 23.1

    Pool civil works

  • 23.2

    Pool waterproofing

  • 23.3

    Pool tiles

  • 23.5

    Pool drainage

  • 23.6

    Pool filtration

  • 23.11

    Pool deck

  • 23.12

    Outdoor shower

25. External / Villa Services

1
  • 25.7

    EV charger provision

26. Testing, Commissioning & Handover

1
  • 26.21

    Authority approvals